11424.1 | ADDISON | VA | | $381,223 | $0 | $381,223 |
20128 | CARROLLTON | VA | BNSF PASSENGER RAIL (DALLAS COUNTY SECTION) FROM JOSEY LANE/KELLER SPRINGS / DENTON COUNTY LINE | $32,364 | $0 | $32,364 |
11745 | COCKRELL HILL | CS | ON COCKRELL HILL RD FROM NORTH OF MOLER STREET / DAVIS STREET | $5,040,299 | $0 | $5,040,299 |
11532 | COPPELL | CS | FREEPORT PKWY FROM SH 121 / SANDY LAKE ROAD | $1,471,883 | $0 | $1,471,883 |
11533 | COPPELL | CS | FREEPORT PARKWAY FROM SANDY LAKE ROAD / RUBY ROAD | $3,363,233 | $0 | $3,363,233 |
11726 | DALLAS | CS | ON RIVERFRONT BOULEVARD FROM CADIZ STREET / NORTH OF CONTINENTAL AVENUE | $0 | $0 | $0 |
2310.1 | DALLAS | CS | DENTON DRIVE FROM SOUTH OF WALNUT HILL LANE / NORTH OF ROYAL LN | $550,000 | $0 | $550,000 |
20190 | DALLAS | CS | ON SYLVAN AVENUE AT TRINITY RIVER | $9,203,000 | $0 | $9,203,000 |
11726.3 | DALLAS | CS | ON RIVERFRONT BOULEVARD FROM UP RR / NORTH OF CONTINENTAL AVENUE | $6,840,000 | $0 | $6,840,000 |
11726.4 | DALLAS | CS | RIVERFRONT BLVD FROM CADIZ STREET / UNION PACIFIC RAILROAD | $25,202,780 | $0 | $25,202,780 |
20263 | DALLAS | IH 635 | HOV 2 AND 3+ SUBSIDY FOR IH 635 (LBJ) | $10,740,000 | $0 | $10,740,000 |
11018.2 | DALLAS | VA | KATY TRAIL FROM ELLSWORTH AVE / WORCOLA STREET IN CITY OF DALLAS | $6,480,000 | $0 | $6,480,000 |
11978 | DALLAS | VA | SIDEWALKS AND LANDSCAPING IN DALLAS CENTRAL URBAN CORE | $1,000,000 | $0 | $1,000,000 |
20067 | DALLAS | VA | TRINITY STRAND TRAIL FROM WEST OF IH 35E (IN BETWEEN OAK LAWN AND MOTOR) / MOTOR STREET | $4,536,039 | $0 | $4,536,039 |
20134 | DALLAS | VA | DALLAS CBD STREETCAR CIRCULATOR EXPANSION-PHASE 1 FROM DOWNTOWN DALLAS / OAK CLIFF | $7,864,510 | $0 | $7,864,510 |
20135 | DALLAS | VA | ATMS COMMUNICATIONS NETWORK / AT VARIOUS CITYWIDE LOCATIONS | $2,425,600 | $0 | $2,425,600 |
20127 | DALLAS | VA | DART S. OAKCLIFF LRT FROM LEDBETTER / UNT CAMPUS | $0 | $0 | $0 |
20302 | DALLAS | VA | DALLAS CBD STREETCAR: SOUTH FROM OAK CLIFF TO THE BISHOP ARTS DISTRICT; FROM COLORADO BLVD/BECKLEY AVE / ZANG BLVD/DAVIS ST; AND YOUNG ST FROM UNION STATION/HOUSTON ST TO THE CONVENTION CENTER HOTEL | $3,664,013 | $0 | $3,664,013 |
20133 | FARMERS BRANCH | VA | STATION AREA TRAILS ALONG DENTON DRIVE / AT VALLEY VIEW LANE (NEAR DART RAIL STATION) | $233,766 | $0 | $233,766 |
20124 | GARLAND | CS | ON PLEASANT VALLEY ROAD; FROM RICHFIELD DRIVE AT CREEK MEADOW LANE / MILES ROAD | $3,539,272 | $0 | $3,539,272 |
20261 | GARLAND | VA | MGR BIKEWAY FROM JUPITER & APOLLO / SOUTH CITY LIMITS AT DUCK CREEK | $2,444,000 | $0 | $2,444,000 |
11528.1 | GRAND PRAIRIE | CS | GIFFORD/BAGDAD/ACCESS MANAGEMENT FROM MACARTHUR BLVD / BAGDAD | $3,524,000 | $0 | $3,524,000 |
11528.2 | GRAND PRAIRIE | CS | ON MACARTHUR RD; FROM IH 30 / HUNTER-FERRELL | $12,000,000 | $0 | $12,000,000 |
11840 | GRAND PRAIRIE | CS | 15TH ST CONNECTION / AT IH 30/BELT LINE RD PARK & RIDE FACILITY | $390,830 | $0 | $390,830 |
20213 | GRAND PRAIRIE | CS | WILDLIFE PARKWAY FROM SH 161 / BELT LINE RD | $25,000,000 | $0 | $25,000,000 |
55251 | IRVING | SH 114 | NORTH OF SS 482 | $6,000,000 | $0 | $6,000,000 |
11901 | IRVING | VA | PEDESTRIAN CONNECTION BETWEEN LAS COLINAS AUTOMATED PEOPLE MOVER / AND THE DART ORANGE LINE STATION | $420,000 | $0 | $420,000 |
20136 | MESQUITE | VA | MESQUITE HIKE & BIKE TRAIL - PHASE 1: NORTHEAST MESQUITE CITY LIMIT TO IH 30 TO NORTHWEST DRIVE TO TXU/ONCOR EASEMENT / TOWN CENTRE DRIVE TO IH 635 | $3,114,918 | $0 | $3,114,918 |
20261.2 | MESQUITE | VA | MGR TRAIL AT MESQUITE CITY LIMITS NEAR DUCK CREEK / MESQUITE HERITAGE TRAIL NEAR NORTHWEST DR | $400,000 | $0 | $400,000 |
20145 | ROWLETT | CS | ON MERRITT ROAD FROM CHIESA ROAD / PGBT | $11,230,642 | $0 | $11,230,642 |
20129 | SACHSE | CS | ON BUNKER HILL ROAD FROM SH 78 / NEW MILES ROAD | $7,614,464 | $0 | $7,614,464 |
20223 | SUNNYVALE | CS | ON LAWSON ROAD FROM SCYENE ROAD / US 80 | $2,167,015 | $0 | $2,167,015 |
11747 | VARIOUS | CS | WINTERGREEN ROAD FROM DUNCANVILLE ROAD EAST OF STEWART BRANCH CREEK / AND DUNCANVILLE ROAD FROM WINTERGREEN TO SOUTH OF STEWART BRANCH CREEK | $3,130,000 | $0 | $3,130,000 |
20132 | VARIOUS | CS | ON MILLER ROAD FROM GARLAND EAST CITY LIMITS / ROWLETT WEST CITY LIMITS | $9,949,496 | $0 | $9,949,496 |
11635 | VARIOUS | VA | M&O - IMPLEMENTATION/ADMINISTRATION OF AIR QUALITY AND TRANSPORTATION PROJECTS FUNDED WITH RTR FUNDS | $511,392 | $0 | $511,392 |
11779 | VARIOUS | VA | DART ITS SYSTEM INTEGRATION - INTERCONNECT LRT, TRE, PARATRANSIT, & BUS INTO ONE SYSTEM | $1,590,720 | $0 | $1,590,720 |
20168 | VARIOUS | VA | EAST COTTON BELT PASSENGER RAIL CORRIDOR (DALLAS COUNTY SECTION) FROM DFWIA / NORTH CENTRAL/RED LINE | $1,301,471 | $0 | $1,301,471 |
20254.2 | VARIOUS | VA | HOV OPERATIONS OUTSIDE DART SERVICE AREA | $4,580,328 | $0 | $4,580,328 |
20255 | VARIOUS | VA | METROPOLITAN PLANNING ORGANIZATION (MPO) PLANNING SUPPORT AND ASSISTANCE FOR SURFACE TRANSPORTATION PROJECTS | $810,869 | $0 | $810,869 |
20256 | VARIOUS | VA | EXPEDITE 404 AND 408 PERMITS AND IMPLEMENT REGIONAL MITIGATION BANK | $1,160,000 | $0 | $1,160,000 |
20267 | VARIOUS | VA | M&O - SAFETY ASSURANCE REVIEWS (SAR) AT VARIOUS LOCATIONS | $210,192 | $0 | $210,192 |
30000 | VARIOUS | VA | NTTA SIB LOAN PLACEHOLDER
FOR PGBT | $63,459,584 | $0 | $63,459,584 |
11661 | VARIOUS | VA | EXPEDITE SECTION 404 AND 408 PERMITS AND IMPLEMENT REGIONAL MITIGATION BANK | $800,000 | $0 | $800,000 |
11679 | VARIOUS | VA | PLANNING SUPPORT & TECHNICAL EXPERTISE FOR IMPLEMENTATION OF PASSENGER RAIL IN REGIONAL RAIL CORRIDORS | $1,100,000 | $0 | $1,100,000 |
11677 | VARIOUS | VA | EQUITABLE TRANSIT FARE DEMONSTRATION PROGRAM / VARIOUS LOCATIONS WITHIN 16-COUNTY REGION | $1,000,000 | $0 | $1,000,000 |